PolyAlkyd

Floor Coating

Quote Calculator

Please fill in the information below in meters to calculate how much you need.

Here's what you need:

  • 0 litres per coat

  • At a recommended 2 coat

  • You need a total of: 0 litres

  • Total Square Meters: 0

Features

  • Heavy duty polyurethane based floor coating.
  • Direct application to most stable substrates.
  • Excellent flow and levelling.
  • Dries to a smooth low gloss finish.
  • Heavy duty coating where extra durability is required.
  • Not recommended for areas exposed to UV.

Where to Use

  • Stable concrete, cementitious and wooden substrates
  • For high traffic areas i.e. floors, stairs, doors, trims, showrooms, workshops etc.

General Preparations

  • All surfaces must be clean, sound & dry.
  • Previously painted sound surfaces can be washed with sugar soap and rinsed thoroughly with clean water.
  • Remove rust from mild steel substrates. If rust cannot be removed completely, spot prime with a rust converter before applying MSPrime.
  • Apply WoodPrime to all new or weathered wood surfaces before recoating.
  • To improve adhesion, sand previously painted stable surfaces and apply Universal UnderCoat.

Technical Details

Product code:

Colour:

LPA000

Standard Colours

Shelf Life:

Packaging:

Storage Conditions:

Stirring Method:

12 Months

1ℓ, 5ℓ, 20ℓ

Store in a cool/dry place

Stir with a flat paddle

Flashpoint:

Viscosity:

Specific weight:

Solids per volume:

Solids per mass:

Spreading rate:

 

 

Dry film thickness

Wet film thickness

Recommended coats:

Flammable

70 – 80 KU (at 23°C)

1.02- 1.09

49 – 53 % (Approx.)

59 – 65% (Approx.)

10-12m2/1ℓ/coat

Depending on porosity, surface conditions and application equipment

40um (Recommended)

125um

2

Drying time:

 

Over coating:

Touch Dry: 4h @ 23°C

Dry to handle: 8h@ 23°C

Minimum 8 hours@ 23°C

Application:

Cleaning:

Brush, roller and airless spray

Mineral Turpentine

Precautions

  • Avoid painting in moist/humid conditions. To allow applied paint to cure, there should be no rain forecast for at least 7 days.
  • Do not paint over surfaces with moisture content above 15% measured with an ultrasonic meter or over 5% with a pin type meter.
  • Stir paint well with a flat paddle.
  • Ideal application conditions and surface temperature should be between: 10°C – 35°C with a relative humidity of less than 75%. It is not recommended to paint in direct sunlight as this will result in the paint drying too fast leading to visible “lap-marks”. Windy conditions might have a similar effect and can cause a deposit of dust particles on the wet paint.
  • To ensure colour– and sheen level consistency, purchase from the same production batch of paint. Touch-ups are not recommended.
  • Tint bases contain fewer litres than advertised until tinted.
  • Spreading rates are theoretical and based on smooth / flat surfaces.
  • Do not wash or abrade newly painted surfaces until properly cured.
  • Allow 7 days for paint to dry properly and 30 days to reach full strength.
  • Store paint in a cool, dry place.
  • Complies with the South African legal lead limit of 90ppm or less.

 

Colour Selection

  • Colours tinted that fall outside of Laminin Largo’s formal tinting system may have risks regarding poor opacity, early fading, UV resistance, over and under tinting or alkaline attack. Please consult an official Laminin agent for advice.
  • Do not alter factory standard colours as this will compromise the products longevity i.e. fading, UV and alkaline resistance, colour consistency and opacity.
  • Bright colours plays an important role in colour selection, even though Laminin only makes use of lightfast pigments certain bright colours have a natural tendency for poorer opacity and UV resistance and might be more prone to alkaline attack. Please consult an official Laminin agent for the best possible advice.
  • Colour variations due to efflorescence (White salty deposits) (alkaline burn or attack) will not be covered under early fading or product failure.
  • The colour, white, may require a 3rd topcoat to achieve opacity and full obliteration.

Health & Safety

  • Keep out of children’s reach.
  • Do not eat, drink or smoke during any application.
  • Ensure appropriate ventilation during application and drying.
  • Harmful if swallowed.
  • Wear protective equipment during preparation, application and cleaning.
  • Avoid contact with eyes.
  • In case of contact, seek medical advice.

Disclaimer

  • Specifications and recommendations are given in good faith and are meant to be used as guideline.
  • All information is based on results obtained from our tests done and experience gained over time
  • Application method and – equipment, condition of substrate and – during application, will have an influence on results. This is beyond the manufacturer’s control.
  • As technology may change over time, please ensure the use of the latest Technical Data Sheet
  • All information listed is owned or used under licence of Laminin Coatings (Pty) Ltd and its related affiliates. © 2013 Laminin Coatings (Pty) Ltd. All rights reserved.